Oftentimes, the project cannot begin to roll-out until basic site preparations are completed. These basics include but are not limited to:
- Electrical installation;
- Concrete pad construction;
- Network cabling;
- Framing; and/or
- Hardware installations;
- Fixture installations; and
- Signage work.